aboutservicescsiassociatescasestudiesclientslinkscontactus
   
   
     
 

Case Study #5: Royal Canadian Mounted Police

Project Operational Control Center Planning and Design
Location RCMP Headquarters, Ottawa, Ontario, Canada
Team Members Eduardo De Diego, Senior Systems Analyst
Construction Value $300,000 (Can.)
Start Date April 2002
End Date December 2002

The RCMP OCC is located at the Alta Vista Headquarters and required expansion. ASRA conducted the HMI (Human-Machine-Interface) design reviews for the control room operations. Review included electrical, mechanical and architectural concerns related to a project of this scope. This expansion project required the design of six (6) operator consoles, accommodating seven (7) operators simultaneously, as well as related electrical and mechanical infrastructure and operational support requirements. In the assessment and reporting, ASRA led the design team and applied the use of International (ISO) standards in Control Room Design as well as documented standards for ergonomic workspaces and HMI design requirements.

 

Case Studies

#1 Canadian Museum of Civilization
#2 Canadian Museum of Nature
#3 National Research Council of Canada
#4 Canadian House of Commons
#5 Royal Canadian Mounted Police

Are your security measures adequate?

Contact ASRA via email; info@asrasecurity.com, or phone; 416-548-4193 to discuss your security requirements.